Proactive site health and safety inspections undertaken for our client, Shotcrete Services Ltd – spray concrete specialists for the culvert and spillway sprayed
concrete lining works at Chew Reservoir in Greenfield, Oldham and lower spillway lining works at Ridgegate Reservoir in Sutton, Macclesfield.
-
Active monitoring undertaken for Cubby Construction Ltd t/a Briscoe Construction on the SP Electricity North West, Tebay South Substation and Parkside Colliery
Regeneration – 132kV Substation Reinforcement Inc, GT Transformer x 2 & 11kV Switch House & Switchgear (Civil & Electrical Works) along with the general works at
Duchy of Lancaster Wood End Farm and Cottage in Dunsop Bridge, Clitheroe.
-
The Consultancy has worked alongside the Portico Sport UK Ltd team during the past 12 months and helped to produce Construction Phase
Plans (CPP), RAMS and to provide support and advice on health and safety matters relating to the construction of Padel Courts and Canopies.
Recent projects include Trafford Padel Club, Phases 1 & 2, Courtside at The Leys, Witney, Oxfordshire, Courtside at Hillsborough, Sheffield
and Parkside Padel Club, Parkside Yards, Southall.
-
Health and safety inspections, undertaken for our Client, MAP Engineers Ltd for works at the Everton FC New Stadium Project, which included
the installation of secondary steelwork throughout the new stadium.
MAG - Terminal 2 Redevelopment (T2R) Project - Movement of structural steelwork from the Laydown area on Level 20, followed by the installation
of steelwork infills and secondary steelwork to Levels 0, 30 and 35 /40. Intumescent paint to new steelwork.
-
Working alongside Kirkman Architects of Altrincham, Pre-Construction Health & Safety Packs and Construction Phase Plans (CPP) produced for the fit-out of family entertainment
centres for Jump Inc at Westwood, Broadstairs, Kent. Namco Funscape, The Brewery, Romford, London Borough of Havering, and Superbowl UK, Aldershot, Hampshire.
-
Health and safety inspections, undertaken for our Client, BDB Special Projects Ltd for works at High Legh and Sandach WwTW that included Drainage,
Ducting and Reinforced Concrete (RC) Works and the Construction of R.C. Interception Chamber. TSR Filter and TSR Pumping Station Works.
Client, United Utilities. Principal Contractor C2V+
-
Health and safety inspections, RAMS development, support and advice provided to our Clients, Cadman and Manpen Systems Ltd and MAP Engineers Ltd on the Lendlease, Our Town Hall, Manchester Town Hall project.
-
Coronavirus (Covid-19) risk assessments produced for a number of our Clients carrying out manufacturing, construction, fabrication, highways works, and civil ground works to name but a few. These assessments are in compliance with Government and industry guidance and clearly set out the arrangements in relation to workplace / physical distancing (Social Distancing), infection control, person hygiene and worker consultation etc.
-
Salford, Leeds and Manchester
Documented Health and Safety Inspection undertaken for our Client – LRL Roofing Solutions on the Sir Robert McAlphine, Chapel Wharf project.
PCI / CPP and support provided to our Client and the Principal Contractor during the refit of a new ROLEX boutique at the Victoria Gate shopping centre complex in Leeds.
Demolition plan of work produced and active monitoring undertaken for our Client during the mechanical demolition of the former Odd Fellows House, York Street, Manchester.
-
-
Demolition Plans of Work (RAMS) produced for demolition, top-down deconstruction and dismantling projects nationwide. This includes mechanical / Brokk robotic and hand-demolition, back propping, strip-out, soft-strip, and the safe removal of non-licensed asbestos.
Site inspections (active monitoring) and environmental noise and dust monitoring also undertaken for our Clients.
-
Left: Documented safe system of work produced for our client, J&M Demolition and Recycled Aggregates Ltd for the mechanical demolition of the former mill / industrial buildings.
Middle: Safety Management System produced for Paradise Developments Limited as Principal Contractor for the Upper Paradise Mill project in Macclesfield, Cheshire.
Right: Dynamic method statement and risk assessment, CoSHH Assessments and Policy statements produced for Manchester Urban Cleaners Ltd for the industrial clearing and cleaning of tramline rail grooves etc, along sections of the Metrolink tram line network.
-
Documented SSoW (RAMS) Produced for our Client, G Williams Joinery Ltd for the joinery package on the Wilburn Basin in Salford and One Regent, Water Street projects, and currently the Owen Street & Crown Street projects in Manchester, in line with their Clients – RENAKER Build Ltd requirements
Health and Safety Inspections (Active Monitoring) also undertaken on the above projects.
-
Documented safe systems of work produced for our Clients, PGS Projects Ltd, Cheshire Building Projects Ltd and Bowdon Building Contractors Ltd for the refurbishment works to Camden House - Ashton-under-Lyne, Foden House - Alderley Edge, and Tudor Lodge in Hale, Cheshire.
-
The Consultancy are pleased to advise that we have provided a site based Health & Safety Advisory service, on the Cytec Solvay Group, £65m, Adhesives Expansion Project, on Abenbury Way, Wrexham Industrial Estate, Wrexham.
This included the provision of a service to our Client, John Sisk and Son as a top-tier contractor to implement and monitor their exacting health and safety standards and those required of the Principal Contractor - Fluor and their Client - Cytec Solvay Group.
-
Support provided to V.J. Donegan & Company Ltd, Health & Safety Department by undertaking HSEQ Audits on the Cross Street, Manchester, Mancunian Way, Manchester and the A6 Manchester Airport Relief Road (Marr) Civil Engineering Projects.
-
Noise Monitoring and Mapping undertaken over a two-day period for our Client, Orthoplastics to establish the average noise levels and corresponding daily personal noise exposure within the Level 3 – OMU & Medical Machining Departments. Noise map produced to provide a visual representation of the findings along with subsequent information & controls.
-
Documented Health and Safety Inspections (active monitoring) undertaken for our Clients – LRL Roofing Solutions on the Interserve Construction, Dandara, Sweet Street, Leeds Project; Warrington Fabrications Ltd on the Styles & Wood, India Buildings, Liverpool Project and Connell Brothers Ltd on the Project Pie, Stretford Mall, Manchester project.
Fire Plan and Emergency Evacuation / First Aid Procedure produced for our Clients, BRAND Construction, Saint Flooring, Colin Briscoe Construction Ltd and Paradise Developments (Macclesfield) Limited to name but a few.
-
Working closely with the head office and operational teams at Autocross Euroshel Limited a documented SSoW produced for the safe installation of bespoke stainless steel or powder coated shelter - Bus, Smoking, Cycle, Pay Station & Sports Shelter etc., for projects nationwide.
-
Fire Risk Assessments (residential)
undertaken for our Clients, AMAY Properties Ltd for Hyde Road, Manchester. Delamere Developments N/W Ltd for Delamere House, Ashton-under-Lyne and Paradise Developments (Macclesfield) Ltd for the Grade II Listed - Lower Paradise Mill and Middle Paradise Mill in Macclesfield in line with The Regulatory Reform (Fire Safety) Order 2005, Article 9 and the principles of BS 5839-6:2019
-
Site based health and safety service provided for our Spanish Client, KONVEX Storage Systems during the construction of the
High Bay Shuttle Pallet Warehouse (Rack Building) at Nestle Waters in Buxton Derbyshire. SSoW and RAMS produced for the whole
build process i.e. Main Frame, PAB, Wall Cladding and Roof Panels.
-
After a due process of planning and preparation documented SSoW produced with our Client, Frank O’Gara & Sons and key
stakeholders i.e. Highways England, Mammoet and Rugby Borough Council for the M53 Junction 2 Moreton North – Bridge Deck
Removal and the piecemeal mechanical demolition / deconstruction of Green Court and Fairway Court, Biart Place in Rugby.